🧩 What Is CIPP Lining and How Does It Work?

Cured-in-Place Pipe lining involves installing a flexible, resin-saturated liner directly inside the existing damaged pipe. Once it’s in position, the liner is cured using heat or UV light, hardening into a new pipe within the old one. This jointless, corrosion-resistant lining restores structural integrity and flow capacity—without digging up the ground.

🔧 Step-by-Step: The CIPP Lining Process

  1. 📹 Inspection & Cleaning

Technicians perform a video inspection to assess pipe condition. High-pressure water jets or mechanical tools clean the pipe, removing debris and buildup to ensure a smooth surface for the liner.

  1. 🧪 Liner Preparation

A flexible liner (typically felt or fiberglass) is measured and saturated with a specially formulated epoxy or polyester resin. The liner is then rolled or folded for insertion.

  1. 🚀 Insertion

Using inversion (air/water pressure) or winch-and-pull techniques, the liner is fed into the pipe and positioned precisely along the damaged area.

  1. 🔥 Curing

Once in place, the liner is cured using hot water, steam, or UV light. The resin hardens, bonding tightly to the host pipe and forming a solid, new interior wall.

  1. Final Inspection

A post-installation camera inspection ensures proper curing and confirms the integrity and water-tightness of the new liner.

🌟 Why Choose CIPP Lining?

🚫 Minimal Disruption

No need to dig up roads, driveways, or landscaping. CIPP is non-invasive and ideal for areas with limited access or sensitive surfaces.

Quick Turnaround

Most jobs can be completed in one day or less. UV-cured liners can set in as little as 15–30 minutes.

💰 Cost-Effective

Avoiding excavation and surface restoration drastically reduces labor and material costs.

🛡️ Durable & Long-Lasting

CIPP liners are resistant to corrosion, root intrusion, and cracking—lasting 50+ years with proper installation.

💨 Improved Flow

The smooth, jointless interior enhances water or wastewater flow, even in previously corroded or rough-surfaced pipes.

Frequently Asked Questions (FAQ)

⏱️ How long does the process take?

  • Heat-cured: Several hours depending on pipe size and resin type
  • UV-cured: Typically 15–30 minutes

🏗️ Is CIPP a permanent solution?
Yes. Once cured, the liner acts as a new structural pipe, rated to last several decades.

🔧 What types of pipes are compatible?
CIPP works on most materials, including:

  • PVC
  • Clay
  • Cast iron
  • Concrete

🚫 Are there any limitations?
Almost None. CIPP requires a partially intact host pipe. Fully collapsed lines may need excavation or pipe bursting instead.

🏁 Conclusion

Cured-in-Place Pipe (CIPP) lining is revolutionizing pipeline rehabilitation. It offers a cleaner, faster, and more affordable way to extend the life of existing infrastructure—without tearing up the ground. Whether you’re maintaining a commercial building, managing a city sewer system, or tackling a residential repair, CIPP delivers performance, efficiency, and peace of mind.

Call us Today